Blasting Engineering Projects are often in a complex natural and social environment, Which Is full of a lot of uncertainties usually the resulting risk affects the smooth implement of the Project that the Blasting engineering Project has the urgent need to strengthen the risk management. Despite the current domestic and international project risk management theory studies have a certain level, general engineering project risk analysis and evaluation methods are many, but because of the risk analysis is not the practical application of the system for induction order, in particular, blasting in the face of specific risks, often choose not to appropriate analysis of risk analysis and evaluation of the implementation. The end result is a project risk analysis is not enough awareness and increase the difficulty of risk management, project directly affected the safety, quality, schedule and cost targets, damaging the effectiveness of the project.First of all domestic and international comparative research project risk management, analysis of domestic and international academic research on the differences in risk and put forward the current risk management in the blasting needed to wait to solve the problem; studied the widely used risk analysis methods, and strengths and weaknesses of these risk analysis methods and application conditions were compared. Focuses on AHP and fuzzy comprehensive evaluation of the two methods, used by AHP blasting engineering risk assessment, risk analysis according to different purposes, different levels were established model. Project risk analysis addresses the three important issues:the individual risk factors on the importance of the project ranking system, the overall degree of risk assessment and risk response plan options. Focuses on the final risk analysis method is applied to specific blasting engineering risk management practice, through the empirical blasting engineering risk analysis, demonstration projects in the explosion in the need for risk management。There are both theoretical part of the full text of an empirical analysis for the future blasting engineering risk management theory and practice to provide a reference, encourage enterprises to further improve the project risk management。 Blasting engineering through effective risk management of the project carried out according to plan as far as possible ensure that the project have been implemented successfully reduce the risk of damage degree, so that the project safety, quality, schedule, cost goals are effective management and control. |