Font Size: a A A

Research And Analysis On The New Management System Of Temporary Electricity For Jinxian Power Supply Company

Posted on:2016-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:C LiuFull Text:PDF
GTID:2132330470456183Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The temporary use of electricity for the management of power supply enterprise is an important part of daily work, as well as for the high power supply company, temporary power management work for a long time is achieved by manual operation method, using the traditional manual mode of operation in the process of both the application user or the relevant departments need to fill out a lot of data and information however, these data are complete, repeated; in the process of handling documents lost phenomenon often occur, there will be difficult to query, search data is not easy to wait for a phenomenon, so that the temporary use of electricity is not only low efficiency, but also a waste of much manpower, financial and material resources.This paper introduces the power management system research background, significance and status of research and application of the temporary county power supply company, the main research content; in business analysis, the problems of system, organization, the original business processes are analyzed in this paper, after the transformation of the business process are given; in functional analysis, through the use case analysis and use case description, the system function, general function gives the system the package diagram and package diagram sub functions, including the use of temporary electricity business management, temporary electricity, exploration management plan for the temporary use of electricity management, charge management, the temporary use of electricity temporary electricity contract management, temporary power construction management package diagram; in the data analysis, the paper on the function of the system needs to process data analysis, given the entity relationship diagram, the establishment of a database table structure; finally has carried on the summary to the research and analysis of the work done, and the further work is prospected. By using this system, which can solve some problems of traditional temporary power management, can reduce the temporary power management in the process of error rate, the temporary use of standardized management process, improve the level of the fine management of the temporary use of electricity.
Keywords/Search Tags:Information System, Function Modelling, Database Modelling, Temporary Power Management
PDF Full Text Request
Related items