| Compared with developed western countries, the starting of the China’s subway construction is relatively late and it has insufficient experience in designing. There is no time to make the full analysis and research because of the rapid development so that the current inconsistent situation of construction speed and availability factor exists in China’s subway construction. The main problem exists in the large and dense populations cannot quickly rush through and recognize a series of activities in short time, resulting in crowded subway space and influencing the operating of subway efficiency greatly. Therefore, this paper is committed to explore the rush through and recognition influential factors in the underground space by the analysis and research on rush through and recognition system in subway space from the subway station structure and layout, wall top decoration and design, the visual guiding system setting and application and other aspects to systematically analyze the rush through and recognition factors affecting people in the subway construction and further explores more reasonable space creation strategies based on this point. It strives to maximize the operation effectiveness of the subway system in order to ease the current traffic pressure. |