Font Size: a A A

Project Management Study On Hubei Gaobazhou Water Conservancy Project

Posted on:2004-06-30Degree:MasterType:Thesis
Country:ChinaCandidate:X W LuFull Text:PDF
GTID:2132360092475785Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Gaobazhou Water Conservancy Project is the most downstream hydropower station in the 3 cascade development Qingjiang mainstream,total installed capacity 252MW,total reservoir capacity 430 million-m3,maximum dam height 57m,length of dam axis 439.5m,total static investment RMB 623.48 million (1998 price).Gaobazhou Water Conservancy Project is a technical complex referring to a lot of specialties,mainly includes civil engineering,geological treatment engineering,metal structure installation engineering,electric engineering,mechanical engineering and so on,project participants include owner,designer,supervisor,contractor and material and equipment purchaser.This paper,through the research on the implementing of Gaobazhou Water Conservancy Project,demonstrated that the project is technical feasible,economic reasonable,and is conform to the state macro policy in external environment. Described the full-aspect management on the design process of Gaobazhou Water Conservancy Project,fully demonstrated that the selection of design scheme and the design quality is directly related to the investment,quality and progress control of the project;Described the full-aspect management on the construction process of Gaobazhou Water Conservancy Project,discussed the management procedure and manner of supervisor in the construction process,how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract;Described the management on the procurement of Gaobazhou Water Conservancy Project,clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract;Described the project acceptance and after-event evaluation of Gaobazhou Water Conservancy Project,fully defined the content for the final acceptance of the project;fully described the comprehensive management carried out on Gaobazhou Water Conservancy Project,mainly focused on the study of information management,communication management,conflict management and risk management,which ensured the smooth execution of the project.In conclusion,this paper,through its research on the project management Gaobazhou Water Conservancy Project,it could complete the construction task of the project in high quality and high efficiency. Meanwhile,it has important instruction and reference meaning for the integrated comprehensive management and project risk management in the project construction of China.
Keywords/Search Tags:Gaobazhou Water Conservancy Project, Project management feasibility Study
PDF Full Text Request
Related items