Computer Management On Installation Engineering Of Pingliang Power Plant

Posted on:2004-11-22Degree:MasterType:Thesis
Country:ChinaCandidate:X J DiFull Text:PDF
GTID:2132360122470517Subject:Power Engineering
Abstract/Summary:PDF Full Text Request
In this paper, the management software of international great project-P3 is adopted to achieve the dynamic management of the whole process plan, organization, correspond, manipulation of building project for the Pingliang power plant, consequently, the questions of the large construction link, the high construction intension, the organize and management of great and complex construction are resolved, and the anticipated aim was finished.The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the P3 in the building Pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager. The traditional management model is changed, which redounds to enhance the engineering quality, and shorten project time, and reduce the technician labor, so the effects on reducing project cost and saving investment are achieved.
Keywords/Search Tags:computer network, engineering management project software P3, boiler installation
PDF Full Text Request
Related items