Font Size: a A A

The Research Of Setting Up And Controlling In Quality System Of The Project Under Construction

Posted on:2006-12-22Degree:MasterType:Thesis
Country:ChinaCandidate:S L WeiFull Text:PDF
GTID:2132360152470151Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The building trade of our country is on the basis of pursueing total quality management, pursue ISO quality and pass through and mark working with authentication in a more cost-effective manner in construction enterprises, in the hope of going still one step further to improve the production quality level of enterprises . But, because of the particularity of construction production, it is difficult to cause construction enterprises to pass through and mark. . It is difficult to run and control after passing through and marking. It is difficult to give full play to ISO quality level.Direct against these questions of the above, this paper has introduced the formulation of ISO standard and background of development at home and abroad at first, analyse that passing through the situation of marking while carrying out the quality system of domestic enterprise of the present stage at the same time. Combine the actual conditions of the domestic building enterprise again according to these situations afterwards, have analysed and researched to the setting-up situation of the project under construction in domestic construction enterprise and project of quality system, and apply the quality control of GB/ T19000-ISO9000 and QA criteria to the quality system of the project under construction of building of our country deeply. It accords with current standard and establishes the system of quality of the project under construction to set up one set at the same time, and the effective one runs and controls the quality system.During the process of setting up such new quality management mode, use method that AHP is it judge choosing to various kinds of key quality element and course of management mode, combine with the project instance at the same time, provide the detailed result of calculation of analysis. Use AHP approach easy , scientific and good, whom effective reduction appear when the key element of quality is chosen and judged can be subjective and random, it is scientific to strengthen. This for want many goal work of decision offer a reliable method in constructing. Analysis results indicate AHP is it solve many goal problem of decision this kind of to use for, convenient, accurate, it is relatively identical with the actual conditions at the same time.Article combine centre project citizen of Shenzhen, to this quality foundation and running and controlling and making the project instance analysis of system, have carried on the preliminary inspection in theory.
Keywords/Search Tags:Quality control, Quality assurance, Quality system, Constructional project, Quality management
PDF Full Text Request
Related items