Font Size: a A A

Study Of Economical Operation & Analysis Of Present Condition In Shandong Province

Posted on:2006-01-25Degree:MasterType:Thesis
Country:ChinaCandidate:P WangFull Text:PDF
GTID:2132360152992205Subject:Agricultural Engineering
Abstract/Summary:PDF Full Text Request
This text is a foundation in a great deal of inquisition data, passing the present condition analysis to the province of Shandong with the flood control, the irrigation for a hydraulic power of low water of the big and medium-sized reservoir of the lord stands to circulate, the research puts forward to generate electricity the variety regulation that the unit consumes the rate of water( then:The water level is more high to consume the rate of water more little, the set that open the number is more little, consuming the rate of water more low, and let up along with the work water head, the unit consumes the quick increment of rate of water). The fixed amount computes the green reservoir of qing feng to lift a hand to the combination in various water level, dissimilarity under of the water head lose the value and change the regulation;Give related and analytical diagram of rainfall and the reservoir parameters.Pass also stand to more than 10 water electricities of province of Shandong the hydrology data of more than 40 years and more than 20 yearses generate electricity the data of the covariance analysis calculation, put forward how to raise the water electricity station work water head, the comprehensive efficiency and a the best set number combination for circulates of the exaltation machine set, the unit that lowers to generate electricity consumes the rate of water;Put forward the macroscopic analysis( great environment influence) and tiny views of the reservoir flood control to adjust to control( be checked the diagram by the rainfall to beg the large value of flood,quantity and leak to measure etc.) and leak water the frequency relation of ability and flood at the same time, make sure the risk analysis of flood to reservoir.Each reservoir of whole province electricity station according to time this draws up the reservoir to adjust the degree and electricities to stand the economy circulates the plan, not only canning raise the flood control safety degree of the reservoir, increasing watering giving or get an electric shock standing ofing generating electricity the quantity, anding canning but also raising the economic performance and social performanceses of the reservoir, attaining end purpose of the economic movement.
Keywords/Search Tags:specific water consumption, risk analysis, economical operation
PDF Full Text Request
Related items