Font Size: a A A

Study On Cost Control In The Whole Course Of Construction

Posted on:2007-12-07Degree:MasterType:Thesis
Country:ChinaCandidate:L LiuFull Text:PDF
GTID:2132360182480334Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
For long time, the cost whole process (possibility research, investment estimation, budget estimation, budget, balance of accounts...etc.) in the our country engineering build to Investment supervisor section, Developments, Design, Audit etc. these sections are responsible of respectively, also are isolated partitioned at the each section with the system. These sections mutually have no the contact, more neither independence build the price to control the duty, and method towards built cost control and application lacks the system present condition, and It is the main reason that the cost is difficult with control. This thesis is with the developments project cost control in the whole course of construction to research object. After analyzing the characteristics of cost control in our country , from the engineering item investment decision, design, construction etc. different stage proceed angle that build cost control, combine the application estimate, analysis, ratio choose etc. to control method, bringing up the cost control the method of each stage with system.To the characteristics of cost whole process of construction, this text introduces an management organized form to control the price whole process of construction, then draw lessons from Hong Kong QS to core with the labor and material the mode of cost control in the whole course of construction, and compared to the inside foreign capital project construction management of mode cost control. Would like to according to the project actual circumstance of our country developments, and draw lessons from the inshore outside in the construction to the experience of cost control. " the foreign is convenient", looking for a developments item that suits the whole process of Chinese state of the nation to build the price to control the method. Finally, this text brings up for match with the developments item the building of whole process the price the control to completely put into practice need to enhance developments of related law and increase the character of construction cost personnel.
Keywords/Search Tags:whole process, cost control, engineering consult, management mode
PDF Full Text Request
Related items