Font Size: a A A

To Optimize The Project Of Energy Dispeller On Weak Groundwork Of FuShan Reservoir Spillway

Posted on:2007-11-21Degree:MasterType:Thesis
Country:ChinaCandidate:M H LinFull Text:PDF
GTID:2132360212958540Subject:Structure engineering
Abstract/Summary:PDF Full Text Request
In recent years, the state has invest a lot to the basic water conservancy establishment. More and more ill-conditioned and dangerous reserviors were confirmed to be constructed. Most of the reservoirs were built in the 1950-1960s, because they were built hastily and scanty, utilized for many years, there are lot of dangerous and hiden risk. All of these seriously affect the works of reserviors and the effect of flood water control.Many of the most important problem is about the spillway . The spillway is an important section of the reservoir. To build a new reservior would invest a lot and be high technical. Once there is a problem, for instance,the flood couldn't be controled, the reservoirs would be riskful and difficult to be remedied. Thus, to get rid of the risk of spillway is the chief matter. The project should be selected economical and technical.This paper will table a logical proposal of the spillway constructions project. It will optimize the project of spillway energy dispeller. According to the analysis of hydrography data and flood account, the paper will bring forward a propose, the propose should be economical, technical and be constructed easily. It also will compare the style of energy dispeller engineerings, every disigning approach and preferences will be analysed and calculated.
Keywords/Search Tags:The Fushan Reservoir, Spillway, Energy Dispeller on the Unsubstantial Foundation, The energy speller projects, Water ram and entrench
PDF Full Text Request
Related items