Discussing On The Management Of House Building Equipment After The Separation Of Main And Assist's

Posted on:2008-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:Y S ChiFull Text:PDF
GTID:2132360242966097Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Accompany railroad great-leap-forward development, that going deep into adjusting and betokening the subsidiary separation job's carries out a distribution of productive forces, the Railroad House Building Unit and the transportation host job separate the trend marketplace already is necessity. Railroad house building equipment is that the essential important component of railage production. Railroad house building equipment controlled good and bad, is related to the main artery that the railroad makes for national economy be unimpeded or not; Be related to the height to provide services house building equipment mass of railage production; Be related to railroad structure enterprise self's survival and be developed; Be related to one's immediate or vital interests being engaged in railroad house building almost 200,000 staff and worker who work.Old railroad enterprise house building equipment control way is to continue to use a planned economy period administration , the railway bureau sets up the accounting managing first order three steps , road bureau building gets along , mark, sub-bureau building gets along acting as the business authorities concerned being Building Segment , not having the property right administration function; Product book manages the property right representing the road bureau , sub-bureau from Building Segment exercising Building equipment assets. Building property Segment is both property right administration unit and the unit being maintained , carried production design by self and, been in charge of a project by self adjusts accounts of in the process of equipment control , repair, the project checks and accepts taking over by self to rebuild , manages a dwelling house as "landlord". The absence restraint sum examines, property right is vague, right duty is ambiguous. The area Shenyang railway bureau of adding is administered is bigger, the entire boundary including two provinces of Liaoning and Jilin , the part area preparing Heilongjiang , two provinces of Hebei and the Nei Monggol Autonomous Region, multi-thread is long. The rate of economic development differs everywhere, people the habitancy living standard is unequal, diversity the everywhere thing job is managed developing degree, the standard people is served to thing job demanding is also different. The house building equipment control method probing a set of the desire for development adapting to new circumstances therefore appears especially important right away.How to make use of limited maintain fund, to manage, repair railroad house building equipment, is that transportation childbirth and families of workers and staff serve the major objective being to study better. And enterprise reforms the reality being confronted with by studying in a deep going way, analysing a railroad carefully, change brought about by distribution of productive forces adjustment and railroad great-leap-forward development; Plain house property Segment comes down now that the property right administration unit is to keep an unit in repair, to be short of restraint and examine, property right is vague, right duty is ambiguous, lead to building equipment mass. The main body of a book having studied carefully, having analysed the cause restricting railroad building equipment control, has set forth the origin producing the above-mentioned problem detailedly.Every railway bureau house building equipment manages way by comparing transversely , the reality launching a pilot project combining with the Shenyang railway bureau, parts bringing forward effectuation to manage and mend , property right return , responsibility clear and definite , become market-oriented operation, by the new house building equipment control pattern clearing the price entrusting service and safety to check result for the amounts adjusting a modulus , being that the subject is on the march with the contract.The Effective guarantee building equipment by the fact that house building equipment control effect and the mass keeping a project in repair link up with building unit clearing income directly meet the requirement intactly; Have structured the building unit seeking the railroad internal market environment existing depending on serving. Break the old administration pattern really, achieve rise building equipment control mass's purpose.Estate management Settlement applying for the concrete example carries out detailed expounding, has stronger theory and reality with estate management.
Keywords/Search Tags:Building equipment, Maintenance repairs, Settlement, Managemen
PDF Full Text Request
Related items