Design And Construction Of The Liquid Presses The Glide Formwork And An Integral Electric Lifting Scaffold For Siemens State Building

Posted on:2008-11-24Degree:MasterType:Thesis
Country:ChinaCandidate:Z W ShenFull Text:PDF
GTID:2132360245993931Subject:Architecture and Civil Engineering
Abstract/Summary:
High layer building because layer number than much, the construction arrange the top and bottom variety not very, especially enter the standard layer the empress, construction construction craft repetition than much, and the high layer building is much for the high layer residence or write floor, development the company force in the reason of the funds cost and the request's work period purpose for specially tightly, contractor too come forming lowering the construction cost but as far as possible and quickly start construction degree of progress, reduce a kind of construction technique for of turnovering, but The liquid presses the glide formwork, an integral electric lifting scaffold start construction technique is concrete engineering with reinforced concrete engineering inside mechanizing the degree highly, start construction speed quickly, field ground take upping little, safe homework having guarantee, synthesizing the performance getting very bigly exaltation of template and outside. Therefore, these mechanize the higher consecution of degree the type's construction technique, got the extensive expansion with apply.The direct direction of the high layer building the construction primarily is a core reel , shear the dint the wall, frame the pillar, frame the beam is a construction quantity with the work period point for degree of progress controlling, these pieces can adopt the slip mold the construction. The slip mold equips main be been lend support toed up by template, promote a template system for, rounding the turn to constitute, and be operated by lord terrace, namely by three greatest systems constitute, the platform mourn the feet hand the liquid for terrace system for constituting, from liquid pressing controlling the set, oil the road with supporting pole constituting of to press to promote the system with inside outside. The design that slip mold equip primarily aim ats above three greatest systems to proceeds the designs. In the building under construction, feet hand use to have great capacity, usage time long, the expenses is high, request safety, apply, economy. Along with the diversification of the building form, urge a toward pack the dismantle simple, move convenience, loading function good, usage safe and dependable direction development. In the corpus that high layer is with the building of super-high layer is under construction, and the whole electricity move to climb to rise the feet hand the one of the 10 new techniques for high layer for superior for having obviously, it using the stuff little, only peaceful dismantle a time, climbing rising the fast convenience, economic performance large raising , is first kind very having expanding the use value building of outside feet hand, drive developments department be included inning the point expanding.The whole climbs to rise the outside feet hand the influence for in the high layer building in the construction process, because tower mourn, promoting first, ascending person's elevator, suffering the stuff terrace and starting the electric voltage etc. the problem, and need to be made on the design's foundation to further handle.The new construction technique, it of conduct and actions of construction technique of The liquid presses the glide formwork, an integral electric lifting scaffold are not only technical innovations, more important bring the exaltation of the cost's descent, quantity and performance.
Keywords/Search Tags:The liquid presses the glide formwork, An integral scaffold, Design, construction, Economic performance analysis
Related items