Font Size: a A A

Design And System Implementation A Circuit Transmission And Distribution Project Integrated Management System

Posted on:2011-07-26Degree:MasterType:Thesis
Country:ChinaCandidate:X J YaoFull Text:PDF
GTID:2132360308964243Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Currently, Information technology in the power industry, the depth and breadth of applications has been extended. As the power industry development and construction of power transmission and transformation growth in demand, computer network has been widely used in power in all aspects of business management, project management objective requirements of the power of information technology must keep up with the pace of construction, Guangzhou Power Supply Bureau creation of an electronic business processing system, full use of computer and network communication technology to support the operation of project management to information management into network infrastructure management, information technology and infrastructure to enable effective integration of project management to effectively improve the overall management level.This topic research and analytical power transmission project management processes, systems analysis of various power companies in the project planning, pre-management, project management, design, construction, supervision and other departments with the relationship between workflow and establish a power transmission project construction landmark nodes. We used. DotNET on open standards, full model, using browser / server structure of the computer and network communication technology to support the operation of project management to information management into project management in the power transmission grid, so that the work of business management and information organic integration of the work. Using a distributed multi-tier architecture application framework to achieve the project pipeline, pre-schedule management, project schedule management, and design personnel with information on the transfer, construction management, and completion of clearing, construction supervision and project acceptance and other computer information processing functions to achieve closed-loop integrated management of integration.The System uses DotNET architecture platform, using MVC architecture design model, As a large quantity of system users, in order to improve the system performance of the concurrent use of database connection pool technology. At the same time, in order to improve system security, the issue of the common Web attacks on the preventive use of SQL injection preventive measures, when the system is subject to SQL injection attacks, automatically entered by the user to inject malicious SQL statements to filter to prevent the system data was submitted by a malicious user to a malicious damage SQL statements.Through the implementation of the project, the goal of the information grid construction project management organizations conform to the objectives to ensure that the building power grid project objectives and tasks in the information technology support can be achieved. To manage the information technology driven, with the means to support information management thinking, with e-business processes to ensure the realization of management thinking, so that the project construction management level and management levels have been raised to a new level. Achieved the full implementation of benchmarking to promote management innovation and pragmatic management infrastructure, enhance management efficiency, improve management capabilities and standards, and achieve the purpose of the management in place, using scientific means to greatly advance the construction of power grids.
Keywords/Search Tags:Electric power industy, power transmission, DOTNET, Information technology, database connection pool
PDF Full Text Request
Related items