Font Size: a A A

Project Management Technology Of Ma Steel BF Construction Project Research

Posted on:2008-07-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y D ChenFull Text:PDF
GTID:2132360308979052Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
Taking Ma Steel 2×3600m3 BF(AB BF) Engineering Project as an example, this thesis studies project management principle and its application in construction project. And here foundation on, aim at the item project manage three control target:cost,progress and quality, the system analysis combines Ma Steel AB BF is the clear and definite item project management is inside a modern engineering for should adopting item technique. The main content:based on WBS(Work Breakdown Structure) method resolves Ma Steel AB BF construction engineering, foundation for further degree of progress plan, cost and personnel etc; based on CPM(Critical Path Method) of item degree of progress plan, realize Ma Steel AB BF construction engineering the degree of progress program and control close combination; based on EVM(Earned Value Management) of the cost control method comes to supervises and control Ma Steel AB BF construction engineering item cost, making cost motion is in the reasonable scope; make use of the quality to manage completely and the PDCA circulating to guarantee Ma Steel AB BF construction engineering item quality.This thesis passes the project management in combinative Ma Steel AB BF construction engineering studies, the system studied the project management especially the content of three controls, and passes to puts in a specific way into practice to tally up continuously, increase writer theories and practice the applied ability.
Keywords/Search Tags:Project management, Construction project, Blast furnace
PDF Full Text Request
Related items