Font Size: a A A

A Feasibility Study Of Hubei Qingjiang Shui Bu Ya Hydro-hinge

Posted on:2004-08-23Degree:MasterType:Thesis
Country:ChinaCandidate:D G SunFull Text:PDF
GTID:2156360092975785Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Shui BuYa hydro-hinge is the upest cock step of three-step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of Qingjiang river, which is going to be developped by Hubei Qingjiang Hydroelectric development Ltd after constructing Ge He Yan and Gao Ba Zhou hydroelectric power stations . The feasibility study report on this project was approved by the Economy and Trade Commission of China in April of the year 1999, and in December the conceptual design of this project was adopted by the State Department of ChinaThe time-limit for a large-scale hydroelectric project is longer and in which the investment is more. Respecting reformation of the electric framework in our country, it is necessary for a investment in a hydroelectric project to consider the capacity of electric market and the competitive ability of offerred price. With the opinion under the examination of the feasibility study report on Hubei Qingjiang hydro-hinge , the price level in the end of the year 1999, new financial policy and rule, and the analysis and calculation of the central China electric market, based on that three-step cascade hydroelectric power stations would unitedly enter the electric network, a father feasibility study has been made in this article.
Keywords/Search Tags:Feasibility study, Unite, Competitive Ability
PDF Full Text Request
Related items