Font Size: a A A

Business Plan Of Hydroelectric Power Plant Vice Generator

Posted on:2004-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:X LiFull Text:PDF
GTID:2156360122966240Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Recently there are situation of electric power shortage in many place of our country. The departments of electric power supplying have to shut off some users to keep the electric power net safe and stability. There are two reasons for this problem. The first one is that the demand of electric power increases quickly. The second one is short of generator, especially large generator.According to this situation we decide to establish a power company to generate electricity and sell it. The main business of the company is to develop small hydroelectric power plant, and transform dc exciter generator that is put into use before 1980. When a generator which has dc exciter use controllable thyristor to replace the dc exciter, we may use the space where the dc exciter was placed before to install a vice generator. We have practiced skill of install vice generator. In this way the company will get high a stability profit.The cost and building period of the project is much short than normal hydroelectric power plant. We will use modern pattern of management to set up modern mechanism of enterprise. We must put good use of our superiority to raise the ability of generation and the profit of our company. In this way we can meet the electric power demand of the society.At the end of 2002, revolution of state power system is put into effect. The next twenty years is a good time to develop power industry. We will use thesedominant positions to get great development.
Keywords/Search Tags:Vice generator, Market, Invest, Profit
PDF Full Text Request
Related items