Research About Present Contract Management Of Construction Enterprises

Posted on:2005-09-10Degree:MasterType:Thesis
Country:ChinaCandidate:W L LiuFull Text:PDF
GTID:2156360152955809Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
With the gradual establishment of socialism market economy system and the entrance to WTO successfully, it brought great influence to our country's construction industry. In order to meet international tradition as soon as possible and enter into the tide of world economy, promoting the reform in the field of engineering cost, construction ministry authorized to printsman Code of Valuation with Bill Quantity of Construction Works in the form of No 119 bulletin on 2 17th, 2003.On 7 1st, 2003,it was authorized to be a national criterion and was printsman to put into practice, consequently, Code of Valuation with Bill Quantity of Construction Works began to popularize in the whole country.Now, construction market is inclined to purchaser excessively and competition is more furious, according to the rule of market economy, some enterprises will win the game or be washed out in the furious competition. It is evitable there will have some enterprises close down, cut short, repeat to be composed, or be annexed, which will be a challenge for every enterprise. Market economy is legal system economy; in which contract is the bible. If construction enterprises want to advance the competence and keep survival, it is necessary to improve the level of construction management to adapt to the marketable competition. The entrance to WTO, which predicates our country's construction enterprises have been facing international market and participate in the international contention. But contract management is still the weakest section in the project management. During twenty years' reform and opening outside world, many construction enterprises in our country walked out to national gate to contract projects, at the same time, some foreign investors and contractors also came to China to develop. In many projects, contractors of our country suffered from a lot of loss because of contract management's misplay. Additionally owners don't perform in rule and some relating laws aren't accurate, which makes our country's construction enterprises face great pressure from every aspect and can't bear deadweight. Our country's construction enterprises didn't even adapt to completely the contract management in the traditional cost model .Now, they have to face the challenge from the form of bill quantity, which is undoubtedly a stern test. To research how to make construction enterprises to get rid of present dilemma, according to improve the level contract management and advance their competence is the topic of the paper.In order to improve the level of construction contract management, we must execute the whole process' management from the subscription to the end of construction contract.Contractor should lower the risks at the phase of the subscription of contract. The risks of construction contract mainly come from owners, contractors, natural and social environments, and the items about construction, according to the analysis of above contract risks,The paper puts forward the measures to resist such risks; consequently, contractors can set up the idea of resisting the risk and advance the competence.The phase to perform contract is the important stage of contract management, the paper puts forward some measures on the base of the reality of construction contract management in our country.The threshold for which our country's construction enterprises contract project will be lowered with the entrance to WTO, at the same time, the opportunity for which other country's contractors come to China will be more. National market will face more international engineering. During the running of national projects and international projects, on the one hand, contractors should deal the partners' relationship with owners to resolve contradicts as possible as they can, but we should see contradicts and issues are inevitable. To the deficiency of engineer in solving arguments, the paper puts forward the way of DAB and DRB, which is adapted in the international projects. And the paper discusses the possibility and countermeasures to use DAB or DRB.Claim managemen...
Keywords/Search Tags:Bill quantity, Construction enterprises, Contractor management
PDF Full Text Request
Related items