Font Size: a A A

Assess Research After The Project Item

Posted on:2006-07-18Degree:MasterType:Thesis
Country:ChinaCandidate:X M YouFull Text:PDF
GTID:2166360155472752Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
The analysis to assess the purpose of item ( or Gui Hua ) that is to has accomplished after the item and execution course, beneficial result and the system that effect and influence are in progress and objective; The check summary of the activity practice by way of the item is defined whether or not the item anticipated target achieves, whether or not the major beneficial result quota of item is realized, and the purpose of item policy decision standard and investment effect is worked and is constantly raised in passes through to analyse to appraise to achieve the sure result, summary experience and absorbs the lesson and puts forward suggestion and improvement. Afterwards the extremity of item period is located in the evaluation, and it can be looked at again to another the new item beginning of period. Assessing mechanism after in order to make genuinely gives play to the effect, and whom will in solve on the system what is commented and is commented and how to comment the question. Clearly and definitely not only assess, and also will assess to the question of some policy layer faces to the question of technology layer face; The method assessing and the means due and that science and technology, society, economy and political objective each other are identical include the mechanism of establishment acception society evaluation, and reduce and surmounts one-sidedness and limitations that exists at the aspect that assesses; Should form the management to assess expert mechanism, and promotes just nature and the sense of responsibility of expert, and raise the foretelling ability of expert and sees clearly the ability. This text, article, etc. was firstly introduced to be assessed appraises after the position and construction item in item period after the person who assesses the item the basic concept and construction item the purpose and necessity and construction item with before the difference which after the person who assesses different and the item assessed with the beneficial result analysis, and assesses the establishment reported etc several studying execution and implementation which assessed after the item after the person who assesses after the method and item which assessed after the work procedure and item which assessed after the basic content and item which assessed after the installation of organization which assessed from the item and item chiefly the assesses quota and item, And with the highway developments item takes the gauge of the system establishes with puts into practice for a process for, introducing developments item behind taking the gauge of system evaluates and the influence evaluates to establish in a specific way with put. into practice.Finally with some a the class highway developments item takes the gauge of behind for a concrete establishment for, passing economic performance evaluation with finance performance evaluating, detailedly inquirying into developments item economy behind taking the gauge of report requests and establishment work.
Keywords/Search Tags:the project item, After assesses, The summary, Implementation, Living example
PDF Full Text Request
Related items