Font Size: a A A

Post Evaluation Of CA7200E3 Transformation-Shell Project And Correlated Suggestion

Posted on:2007-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:H T LiuFull Text:PDF
GTID:2179360182996111Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The content of the article is that analyzing difference between management result of CA7200E3 transformation-shell project to feasibility study from 2000 to 2005.The article calculate the sale income, gross cost, income, cash flow, internal rate of return, net present value, payback period in etc. Then I contrast analysis result of calculating with one of feasibility study and national standard, I have got a conclusion to analysis though CA7200E3 transformation-shell project from 2000 to 2005 management result can not achieve than assume, but this project management result is better than national standard. In conclusion the project is successful .【38-40】As proceeding the assessment, the article also gives many suggestion on the future of the project. I have a lot analysis from several aspect, they includes project background analysis, market analysis, project condition analysis, finance analysis, etc. These analysis prove that the project is feasibility. I hope that these advices will be adopted. I believe that these project will promote the future development of the project. In this project we have adopted many successful experiences such as strategic enterprise union and project purchase bid etc. These experience refer many precious mode to the first car limited cooperation .As the last stage of the project, the project evaluation is the extension of whole project management. Through the project evaluation can summarize many experiences and toras in project management. They can be used for...
Keywords/Search Tags:Project, Project Post-Evaluation, Financial Assessment, Project Management, Correlated Suggestion
PDF Full Text Request
Related items