Application Research Of Time Management For Company H’s Tar Unit Control System To Update Construction Project

Posted on:2011-04-25Degree:MasterType:Thesis
Country:ChinaCandidate:H B ZhangFull Text:PDF
GTID:2181330467478189Subject:Project management
Abstract/Summary:PDF Full Text Request
Progress management, an important branch of Project Management, is the key management take ensures the project completed on time. This essay is written based on project management and progress management basic thinking, the focus is to analyze the internet plan technology. From the project plan design, improvement during project implementation and project progress control, in order to have a detailed discussion of the progress management method of the project.This essay consolidates a real case (H’s Tar Unit Control System To Update Construction Project) in order to apply the theory of project management to the project. We will focus on the schedule control via the combination of theory and actual condition. From the plan of the project schedule to the application and control and then the adjustment of the project. In fact, it could be elaborated from three aspects:(1)Design of Progress Plan:Via analyzing the first hand data for project. In order to ensure solid foundation, the aspect of duration, resources, project requirements is important as the critical success factor. Using interact plan technology to design the initial marketing survey will be one of the aspect to consider.(2) Implement of the project plan:based on the information via collection, settle, deposit and searches.(3)Control of Project Implementation:based on the progress situation to monitor and follow up, control the project implementation. Making proper alignment and renewal within the plan scope and the actual happenings. The purpose is to ensure completion of the project based on the planned requirements.This essay adopts methodologies from research on theories and practical implementation. At the same time, it refers to extracts both from domestic and overseas. Based on the present project theories and actual application development, making progress management theory applied to H’s Tar Unit Control System To Update Construction Project. It has good reference values in general to H’s company and it will have a strong practical guiding significance in the progress of H’s company project management and it has achieved good effect during the actual work.
Keywords/Search Tags:Tar unit control system, Project management, Time Management, Critical Path, Schedule Control
PDF Full Text Request
Related items