| The sewage treatment system is one of petrochemical enterprise most important infrastructures, Its transformation renews the degree not only directly concerns this profession, this enterprise's economy to be sustainable, Moreover indirect radiation social environment sustainable development. at present, China water resources per capita are low, And the space is uneven distribution, Oil, It is also the site of industrial blood, And the people's livelihood is related to the important strategic resources, But oil field production and groundwater resource use "investors", Solve production and living water problems, against Is oilfield sustainable development cannot bypass one of the difficult problems. From this,, develop effective economic sewage disposal and recycle specification oilfield enterprises sewage disposal engineering is imminent.The extension oil field limited liability company Qinghuabian extraction factory the sewage place carries on the transformation extension to Wang Piwan, The main body uses the microorganism + membrane processing craft, Guaranteed that the water leakage water quality satisfies the low seepage oil field to the recirculated water request, Does to a construction, in the near future will satisfy, long-term adaptation, Realizes the sewage zero emissions, reduces each kind of water treatment chemical agent to have two pollution to the environment; Has realized to the oil field sewage comprehensive utilization, for construction science sustained development, The resource conservation, the environment friendly enterprise has laid the foundation.This article according to the project management the basic flow, Using project management theory method and knowledge system analytical study extension oil field Qinghuabian extraction factory Yaodian Wang Piwan sewage craft innovation project, Based on project design, construction and completion entire process, Has analyzed this project core questions and so on construction progress, cost and quality, Key emphasis quality objectives concrete step and implementation measure, Guaranteed the project in is controlled in the condition, take the quality as the premise, the coordinated progress and the cost, unify three essential factors, Causes the project to launch smoothly under the ideal expectation, Take the economy, the society, the environment as the weight targets, pays great attention to appraise its combined earnings, by financial data quantification economic indicator, While had affirmed the sewage craft transformed the new technology also to propose an oil field enterprise sewage craft innovation project new management mentality and the appraisal system, Reflects the essential elements objectively to the whole the influence, Causes the appraisal result to be more comprehensive, to be scientific and is reasonable, has also contributed certain reference value to the similar project management. |