Font Size: a A A

Reserch In Investment In Road Construction Of N0.10 Oil Production Plant Daqing Oilfield Co. Ltd

Posted on:2012-11-12Degree:MasterType:Thesis
Country:ChinaCandidate:Y PengFull Text:PDF
GTID:2189330332997110Subject:Project management
Abstract/Summary:PDF Full Text Request
Daqing oilfield development road is with gradually formed. Daqing oilfield were all kinds of road 8,300 kilometers (excluding factory with life roads). Among them, the dry branch and the peripheral oil fields about 1500 kilometers road, well drainage road, the drifting road, pitted road, totaling approximately 680 km. Oilfield highway is with surrounding counties dredge oilfield bridge, is the guarantee of the oilfield road unimpeded, oilfield construction steadily and rapid development of the foundation. Oilfield compared with general road road, not only have general road, and is the generality of the essential oil production line, with specificity.The peripheral oil fields in heilongjiang zhao most state, such as domestic, belong to zhaoyuan county plains, in line, with wide coverage and scattered, total mileage long, management of the characteristics of big, difficult autobahns due to use frequency low, cause pavement maintenance is not seasonable, pavement seriously damaged, the serious influence of the oilfield production, life. Only the limited funds scientific and reasonable into oilfield in road construction, to ensure that oilfield regular production.With the extension of oilfield development time, how to effectively control the ground engineering investment and reduce operation costs, improve efficiency is the primary task of the oilfields development. Based on the engineering practice in recent years, oil on the road of chaoyang ditch oilfield road system analyzed systematically the pavement structure from the oilfield commonly used the development process, the road pavement structure, various types of features and applicability of cost ratio are analyzed. According to the characteristics of the peripheral oil fields, combined with the road of project management theory knowledge, the quality of road construction projects oil under effective control and cost. Use the entire process control of fabrication cost diagram, theory and method, this paper analyzes the engineering cost incurrent oil-field road, and determination and control of early stages and the weak link investment cost of construction stage of the determination and control analysis of influence factors and puts forward to lower the project cost management countermeasures, these countermeasures played a exactly determine investment estimation, effectively control investment and investment saving loopholes, the good effect. In addition, puts forward some methods to reduce the investment in roads of oil measures, including optimization earth-gathering mode, put the wrong lane, minus the narrow road shoulder; Adjust measures to local conditions, strengthening the reasonable choice road-building material construction management, ensure the engineering quality, strengthen day-to-day management and road maintenance work and reduce the construction cost and the oil road, improving the standard of the economic benefits of the peripheral oil fields.Through the oilfield project cost management way that, in order to improve oilfield, the ratio of road in project implementation process of the project, quality, cost and time for effective control can with a small cost investment obtain better roads service quality and service life. Any projects need to use project management approach to effectively manage and control, this is also a recent project management became the fastest growing management discipline, one of the areas. In the current environment, the implementation of project management is the guarantee of jether enterprise in advance, can guarantee the implementation of the construction project, reduce the cost of the project smoothly, maximum achieve the desired goals, it is our research project quality management theory of meaning.In recent years, not only in the early construction in oilfield road by project management method, not late in the process, we are also employing maintenance project management approach achieved carry quality, reduce investment role. Because of the construction and maintenance of the road oilfield reasonable forecast and maintenance cost, the design of oilfield enterprises production management is an important content. In actual work, often due to natural, technology, human, policy and other elements, different influences to the cost of oil, save the way the cost of oil road, still needs project management knowledge and oilfield road construction actual continuous exploration and practice.
Keywords/Search Tags:Oilfield, investment in roads, cost control, measures for improvement
PDF Full Text Request
Related items