Font Size: a A A

Application Of Post-project Evaluation On Electrical Power Grid Enterprises New Project

Posted on:2011-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:Z M ZhangFull Text:PDF
GTID:2189330338481981Subject:Project management
Abstract/Summary:PDF Full Text Request
According to the project management theory, and the electrical power system invest management request for fixed assets, unifies with the electrical network construction and the transformation characteristic. The after project evaluation appraised the quality synthetic evaluation system, including the project implementation management appraisal, the social impact appraisal, the technical appraisal and the financial appraisal, as well as the general goals to realize the degree conclusion and the long-enduring appraisal.After concrete the actual project appraises, for example the Tianjin aviation 220kV power transformer projects, which uses the project implementation management assessment method to project earlier period targets to initiate the project appraisal, construction implementation appraisal, investment control appraisal, foundation management appraisal to carry on the appraisal. It also uses the production processing assessment method to proof conclusion for the project earlier period, which unifies the power transformer project construction necessities to produces the operational aspect--Power supply ability, reliable, the generating devices'service level, the power line voltage quality and the power supply appraisal safely analysis. It uses the economic efficiency assessment method, after completing the production project investment finance benefit re-evaluation, after computational item production, actual finance evaluating indicator, aspect the reflection project or enterprise profit ability, credit capacity, transport business ability and develop power situations. After project influence appraises, the main appraisal and the appraisal air pollutant prevention measure, the water pollution processing measure, the solid waste processing measure, the noise processing measure, electromagnetic radiation regulatory measures and so on processing measure, oil pollution processing measure carry out the result. We use the social efficiency appraisal, the consideration project to promote the local economic development, to improve the lives of the people the promotion effect. Finally, we propose after the project, appraise the quality synthetic evaluation, and realize the degree, the project success through 2 major targets or quotas goals. To the project quality synthetic evaluation score and the conclusion, the existence question, the lessons learned and teaches, proposed that the suggestion and the measure, qualitative summarize the project success. Simultaneously proposed that has the feasibility to profits from the significance suggestion and measure.
Keywords/Search Tags:Electrical power grid enterprises, Post-project evaluation, New Project
PDF Full Text Request
Related items