Font Size: a A A

Study On Risk Analysis And Controlling Of The Construction Project Construction Agent System Model

Posted on:2010-06-10Degree:MasterType:Thesis
Country:ChinaCandidate:Y J HuangFull Text:PDF
GTID:2189330338482188Subject:Project management
Abstract/Summary:PDF Full Text Request
Due to the current investment system, there are many problems, the government investment decision-making more scientific and democratic need to be further enhanced. According to the "State Council's decision on investment system reform," the State Council has decided to further deepen the reform of the investment system. We need to strengthen the management of government investment projects, improving the implementation of the building. On the non-government investment projects to speed up the implementation of "Construction agent System", by way of tender, select specialized project management unit is responsible for the implementation of the building, after the completion of the inspection handed over to the use of units. To enhance awareness of investment risks, the establishment and improvement of government investment projects in risk management mechanism.Construction agent System pilot to prove the superiority of the system, but as Construction agent System to implement a new project management model, it is bound to the existence of many uncertainties, the need for a comprehensive and profound understanding of the Construction agent System in the current mode of operation of the environment There are risks. This thesis is used as the starting point for the implementation of construction projects Construction agent System model produced by the risk of an in-depth and systematic research.First, this thesis shows China's government investment projects implemented by non-profit Construction agent System model described in detail. With the United States, Japan and Hong Kong's government investment project management mode contrast, reflects China's government investment project management Construction agent System model, as well as analysis of the current mode of implementation of the Construction agent System problems, pointing out that the implementation of the pilot model of Construction agent System Is the existence of various risks. This was followed by the establishment of a project risk management approach, this method is for projects proposed by the Construction agent System, and general risk management model, the proposed risk management approach did not evaluate this step, and the more the risk of continuing the project management. The method consists of three steps that the risk management plan, project risk management and continuous risk management. Third, this thesis Construction agent System for in-depth analysis of patterns, analysis of the main sources of risk:the relevant laws, imperfect system, built on behalf of the corporate status of the fuzzy, on behalf of construction companies and funds to ensure quality, as well as the ability to participate on behalf of Projects of the main parties, such as asymmetric information. Construction agent System and then on the mode of implementation of the project in accordance with the risk of the causes of these risks are divided into three categories, mainly environmental projects run the risk of projects arising from the conduct of the main risks and the risk management process. According to the paper on Construction agent System project risk identification and classification of the proposed Construction agent System project risk management strategy of two types of risk:One is risk control strategy is a risk of financial strategy. This thesis concludes with Construction agent System for the project risk management should be taken to the continuity of management in order to respond to on behalf of projects in operation in the process of constantly arising from the uncertainties caused by the risk. Finally this thesis takes Construction Agent System Rules for a certain district of Changsha City as the implementation of the project case study analysis of the implementation of the Construction Agent System in the area of risk and corresponding risk control recommendations.In short, this thesis through research can improve the matching consignment policies and measures to reduce the risk to provide some reference, the government can give full play to its investment in the project management.
Keywords/Search Tags:Construction agent System, Project Management, Risk Management
PDF Full Text Request
Related items