Cost Management Of Desulfurization Project For Large-Scale Fossil-fired Power Plant

Posted on:2006-01-23Degree:MasterType:Thesis
Country:ChinaCandidate:Y L WangFull Text:PDF
GTID:2189360212467457Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The world economy is developing very quickly now, whereas the environment pollution especially severe SO2 pollution aroused every country attention in the world. The SO2 emission of industry is one of main reason of air pollution in China, and most of SO2 emission come from fossil-fired power plants, so it is very important to control SO2 emission of fossil-fired power plant for disposing air pollution.FGD (flue gas desulfurization) technologies were imported from foreign countries in China in 1990's, some demonstration power plants were built in this period, and good environmental and social benefits have been gained. But these FGD demonstration projects is very expensive, it brought much financing pressure into power plants, increased operation cost,affected enthusiasm of FGD construction of power plants. So we must control cost of FGD by effective management.The article introduces measures and characteristics of construction engineering cost administration in USA, Japan and Germany, also introduces status of cost management in Chinese power industry. FGD cost management of large-scale fossil-fired power plant is not some departments or specialties responsibility, it is a systemic work, FGD cost must be managed at every step during the whole process. The old 2×328.5MW oil-fired boilers retrofitted to same capacity fossil-fired boilers in Tianjin Dagang power plant, and besides, lime stone-gypsum wet process FGD engineering were built at the same time. Discount loan of central government and import goods tax free policy were applied to this project, which make a good policy condition to control cost. This article set forth method and experience of FGD cost management.Firstly, a fit construction mode to control FGD cost must be selected, which could be determinate according to project conditions; the design institute shall fully play a lead role during project preliminary feasibility and feasibility study, the owner shall appoint some able and salted mangers to demonstrate and optimized technical scheme; strictly comply with design standard, make out cost control design according to...
Keywords/Search Tags:cost management, flue gas desulfurization, method
PDF Full Text Request
Related items