Font Size: a A A

Risk Analyse And Insurance Study On Xuecity Powerstation

Posted on:2008-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:G W ChengFull Text:PDF
GTID:2189360215955455Subject:Insurance
Abstract/Summary:PDF Full Text Request
Along with the nation western region the putting of big development strategy into practice keep on with national economy, health development, need towards energy in nation surge, but water electricity engineering is with its environmental protection, clean, can circulate to make use of to wait the with abundant resources'advantage, and get the booming development. However, water electricity engineering the investment is big, period long, take effect slow, the risk is big, once the crash will bring bigness of property with personnel loss. Therefore, this text is on the combinative general foundation of theories risk, in details analyzed the engineering's every kind of risk of water electric tied, and bring upped some useful of risk management measure. Article empress half the water electricity of part of combination Qualities stand to survey to design the data, on the analysis the foundation of the engineering's risk, with the engineering insurance right replied the water to give or get an electric shock the engineering risk the most means- engineering technique the means to proceeds the detailed treatise, summary inside project for of validity of some lines.
Keywords/Search Tags:Hydropower engineer, Risk management, Property risk, Person risk, Engineer insurance
PDF Full Text Request
Related items