| With the socialization of production and the globalization of world economy, the port has become the important foundation of China's national economy and foreign trade. Especially after China entering the WTO, international economic cooperation opportunities increased, status of the port seems more and more important. Port construction and investment is booming all over the world. But the port construction project has huge one-time investment and longer construction period, highly dedicated as well as very difficult for other use once completed. Therefore, the evaluation before investment on port construction is important, and has gained more and more attention of the investors.In order to ensure the economic feasibility and rationality of the port construction projects as well as avoid huge economic losses due to error decision of the investors, this paper uses project evaluation theory and method as its basic tools, port construction projects as major research subjects, explores the relative theory of project comprehensive evaluation, then set comprehensive evaluation index system and model combining the characteristics of port construction projects, ensure the healthy development of port project by further testing the theory and method with project examples. This paper is divided into six parts:The first part generally introduces the purpose and significance of the subject, domestic and international evaluation methods and research development status of the port construction evaluation theory, which leads to the main research content and methods of this paper.The second part makes further exploration on the research subject from the following aspects: connotation, classification, characteristics and overview of the port construction project.The third part researches on the basic concept of comprehensive evaluation of port construction project and its main contents included financial evaluation, the evaluation of the national economy and social evaluation. This part is the main theoretical basis of this issue.In the forth part, comprehensive evaluation index system and model of the port construction was set and researched combining the characteristics of port construction and the basic comprehensive evaluation theory. In this paper, fuzzy comprehensive evaluation method was applied to the port construction projects comprehensive evaluation with the comprehensive evaluation model set so as to realize the comprehensive evaluation of the project.In the fifth part, by applying the multi-level fuzzy comprehensive evaluation model to the Jingjiang of Jiangsu Taizhou Port Newport operation zone two terminals, the theory and methods proposed in this paper was further verified. Part VI is the conclusion and Prospect. It makes conclusion of the research work, then prospect about the further research work. |