Font Size: a A A

The Development And Application Of Performance Management System Project In Shiheng Power Plant

Posted on:2009-04-19Degree:MasterType:Thesis
Country:ChinaCandidate:X Z ZhangFull Text:PDF
GTID:2189360242986935Subject:Project management
Abstract/Summary:PDF Full Text Request
As China's market economy develops and electricity reformation carries on, power generation side faces fierce market competition, which results in new requirements for the internal management of the plant. The development and application of performance management system project in Shiheng Power Plant is of great significance, which can enhance the capacity and quality of staff, achieve the strategic objectives of enterprise, and improve the competitiveness of enterprise.The existing problems about performance management system in Shiheng Power Plant are analyzed based on introducing and summarizing the technology of performance management. 10-index evaluation system is established, and analytic hierarchy process is used to determine index weight. Evaluation procedure is developed, and its specific operation is described. The experiment study of Shiheng Power Plant is given, and its implementation benefit is analyzed. Finally, the corresponding suggestions on the implementation of performance management system in Shiheng Power Plant are proposed.
Keywords/Search Tags:Shiheng power plant, performance management, 10-index evaluation system, analytic hierarchy process
PDF Full Text Request
Related items