Font Size: a A A

Research On Enterprise Project Management Model Base-on MICK-4FI Resource Operation Model

Posted on:2008-09-08Degree:MasterType:Thesis
Country:ChinaCandidate:G ChenFull Text:PDF
GTID:2189360245491335Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
We had to accept the truth that projects and efficient project management must be in accord with the strategy of company, and the key link between this two sides is the ability of enterprise project management which is able to accord the realization of company's strategic objectives with the deliverables of single project and the project management tools and technologies. As the inevitable and organic combination of project management and strategy management, Enterprise Project Management (EPM) is the advanced form of project management. It is a kind of systemic and high-level management of enterprise which employs the principles, technologies and methods of project management. However, the current research of project management was mainly focused on the single project. There is a lack of the strategic consideration of company's multi-projects management and the studies of project management model based on enterprise strategy management are very limited.This thesis introduces the Resource-Base View (RBV) into this area and combines RBV with EPM. An enterprise project management model based-on RBV which adopts both advantages is proposed for the improving of enterprise project management and establishing and consolidating of competitive advantage.Firstly the origin and contents of EPM and the MICK-4FI resource operation model as well as its mechanism is detailedly discussed for the establishing of theoretical foundation. And then the EPM model based-on MICK-4FI resource operation model is proposed and explained. We particularly discuss the portfolio management including its function, main process and methods used frequently. Finally the application of this model is demonstrated by a case, which is a consultation about the improvement of EPM ability of the client enterprise, with the result that this model basically meets the practical requirement of enterprises and has the certain value of practical application.
Keywords/Search Tags:Enterprise Project Management(EPM), Resource Operation, MICK-4FI, Portfolio Management
PDF Full Text Request
Related items