Font Size: a A A

Study For Shandong Netcom NGN Project Stakeholders Management

Posted on:2009-10-23Degree:MasterType:Thesis
Country:ChinaCandidate:D S QinFull Text:PDF
GTID:2189360272471557Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
In the 1990s the ever-changing communications technology, communication within the field of application of new technologies led the domestic telecommunications operator business model diversification, along with domestic telecommunications operators to integrate the various restructuring, increasingly fierce competition in the telecommunications industry, communications equipment vendors and Technology and market competition heated start in the tough competitive environment for telecommunications equipment manufacturers of telecommunications operators in each communication construction projects gave full attention, a growing number of project management methods have been applied to the operation of the project.Stakeholders in the project this regard, communication construction project management in customer relationship management (CRM), decision-making chain analysis, and other items related to the method has been more applications, but in communication construction projects in the project stakeholders for effective , Without missing analysis, and the risk of potential models and should not be fully applied, the project stakeholders in the management of just floating surface, no in-depth study.In view of this, first of all, this paper, the current competition in the telecommunications industry, detailed analysis of the competition lead to changes in the project management ideas and models of change. Analysis of the current telecommunications industry stakeholders in the management of the existing problems, the paper elaborated on the purpose and content.Secondly, the details of the domestic and international stakeholders in the development process management, project management through the use of the basic theory, learning the stakeholders to identify ways and needs of the identification and analysis, in a targeted manner proposed Solutions . Turn on the role of stakeholders in risk management for a certain amount of study and summing up a number of identification methods.Thirdly, by Shandong Netcom NGN project, the project has detailed knowledge of the situation, described in detail in the communication construction projects in various stages of the project features and content of the Shandong Netcom NGN project stakeholders through the use of Stakeholder analysis method was detailed and exhaustive identification, identification stakeholder on the basis of their demand for a system of identification and analysis, are given a specific method of response.Fourthly, the study of the Shandong Netcom NGN project the role of division of labour, through various projects in Shandong Netcom relevant departments and the role of the analysis, to understand the role of the project may exist in the sub-risk, and there may be a risk of targeted Response.Finally, through the project stakeholders in Shandong Netcom NGN projects in the application, obtained in the telecommunications industry in the project management stakeholders in several important ways and gives the follow-up study of the suggestions.In this study hope that through Shandong Netcom NGN project stakeholders a series of management methods for communication operators and communication construction projects to provide an effective project stakeholders mode of management and enhance project degree of satisfaction with the interests of all parties to ensure the smooth progress of the project Implementation.
Keywords/Search Tags:project stakeholders, NGN project, needs, role risk
PDF Full Text Request
Related items