Font Size: a A A

Research On Schedule Plan And Schedule Control Of Public Traffic Surveilant System Project Of Junhua Company

Posted on:2009-10-12Degree:MasterType:Thesis
Country:ChinaCandidate:J SunFull Text:PDF
GTID:2189360272479781Subject:Project management
Abstract/Summary:PDF Full Text Request
Bus transit management control of enterprise management is the core business, improve China's urban public transport operators scheduling, is to improve urban public transport service quality, improving the efficiency of bus operators an important way. For a long time, China's most developed cities in public transportation bus operators plan relied mainly on management experience and intuition, bus operators low technological contents, the lower level of service. Bus management monitoring system for the modernization of public transport operation to provide technical support and security, scheduling and operations to achieve high efficiency, passengers on time, fast and comfortable service, increase the attractiveness of public transport.This paper is the view of the above problems and the solutions proposed, the paper first systematic analysis of the Army, the bus company management control system the status of R & D projects, on the basis of this combination of bus operation and management features to manage the public transport Monitoring system for the needs of system software. This was followed by the needs of the project, such as a technical analysis, research and development work on a master plan. Use of qualitative and quantitative analysis methods to identify and respond to risks. Decomposition of the structure of a work plan and network technologies developed a project plan and draw plans for the Project Network. Project implementation process, the cost of distribution and use of earned value analysis control costs. Finally, the bus monitoring and management development system research and development of the construction period, costs and the progress of the optimization, as project managers determine the management objectives of the project, the goal of optimizing under the premise of papers also against time, cost and progress of the corresponding management Measures and methods of management objectives for effective control, thereby protecting the optimization objectives.To meet the public transportation needs of the growing efficiency and product innovation needs to carry out software development is a highly complex task. How to monitor public transport management system software development work in a systematic and efficient manner, is the theme of this paper. Project management is today's software engineers for software quality assurance and production efficiency one of the main instruments. Combining modern public transport enterprises of the actual situation, the application software development project planning and control management of the study, given the implementation of public transport enterprise software development project management operational methods. Project management methods used in the military, the actual development, and achieved very good results.
Keywords/Search Tags:public transportation monitoring and management system, Project scheduling plan, project scheduling control
PDF Full Text Request
Related items