Research On Control Of Time And Costs Of Repairing Projects Sea Oil Production Platform Outside The Committee--Case Study For China National Offshore Oil Corporations

Posted on:2010-01-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z G WangFull Text:PDF
GTID:2189360272487716Subject:Project management
Abstract/Summary:PDF Full Text Request
Recently, project management received more attention from all walks of life, project management theory has been. In practice, however, project management, progress lagged behind, unable to track the cost of the widespread problem. Presently, the better the results of research project management, as well as how the theory of the real ground, how can the actual use of project management work, is a priority.Project Management is an integrated, integrated management process. The real progress in controlling costs and the need for project process will be combined with the cost of a comparative analysis. Domestic and foreign scholars to address the progress in a cost optimization theory on the issue carried out various ways to establish a number of optimal solution to the problem and proposed a mathematical model calculation, but the combination of a lack of project management activities and specific guidance The implementation phase of project management application.In this paper, work practice, the use of theoretical research and case studies of the combination of methods, project management through the study of the domestic situation, combined with offshore oil outside the maintenance committee of the concrete practice of project management and research, that the progress of a comprehensive and cost control is the Project Management Should solve a major problem. Committee for offshore platforms outside maintenance project management and management of progress in cost management is not an effective combination of lack of timely and accurate information as well as the shortcomings, and the progress of the project cost control principle of joint research, progress on a cost basis of the theory of joint control of an in-depth Research will focus on research projects in the process of tracking and real-time analysis of the deviation, which will be made outside the Project Management Committee and the effective integration of asset management and information technology is an effective management method in the current industry-leading asset management Software (MAXIMO) on the basis of the development of the committee outside the maintenance cost of the project progress of the comprehensive control model and the model example of practical and science.The combination of mature asset management system outside the Commission to maintain the progress of the project cost of the joint control of information, not only reflects the dynamic implementation of the project management ideas, while the integrated asset management and other information, will help carry out the overall asset management, settlement of the Offshore platforms special circumstances brought about by the project management and information scattered behind.
Keywords/Search Tags:project management, offshore platforms, appointed outside the maintenance, control the cost of progress, MAXIMO
PDF Full Text Request
Related items