| As China's telecommunications market to control the gradual opening up, the carriers between the increasingly fierce competition. Telecom operators as a technology-based enterprises, the evolution of the network and the application of new technologies is basically the line, it is difficult to set up technical barriers to the adoption of a way to gain competitive advantage, and cost control for enterprise survival and development of the more To the greater. As the communications construction project itself has a large investment, long-term investment characteristics in communication projects, how to fine-adopted to effectively manage the distribution and use of the limited construction funding to reduce the cost of the project, saving investment, to improve the building Investment projects economic and social benefits, has become an urgent need of the important issues covered.First of all, the thesis paper on the research background and significance, and cost control of the concepts, principles and methods used are described. And then to Chongqing Unicom's blueprint for the project, an analysis of Chongqing Unicom projects in various stages of the process of the existing problems in this article, Chongqing Unicom projects in accordance with the actual construction works will be divided into investment decision-making, design, bidding and tendering, Construction, such as the completion of the stage and made use of the whole process of cost control on the construction project, Chongqing Unicom's cost-control ideas. On this basis, that the investment decision-making stage should be accurately estimated at the beginning of the investment, according to our capability in the design stage through rigorous management of public bidding to reduce capital investment in construction, and engineering resources to strengthen the process of change management Control costs in the stage of completion of more projects to do, set a fixed price, the hidden record of the project, such as changes in audit work to ensure that costs are not unnecessary waste of cost control measures. Finally, Chongqing Unicom's access network construction project as an example for the whole process of cost control for that. |