Font Size: a A A

Study And Apply On The Method Of Post Project Evaluation For FGD In Thermal Power Plant

Posted on:2009-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y LiFull Text:PDF
GTID:2189360275984932Subject:Project management
Abstract/Summary:PDF Full Text Request
The necessity and procedure of FGD evaluation were explained in detail, which is the key to scientific management. Theories and methods for evaluation after project construction were studied in this paper, based on which the characteristics, contents, basic principle sequences were analyzed and the index system of post project assessment was established through AHP. In light of the fuzzy comprehensive evaluating model, this paper built a set of post-evaluation models and methods for the FGD project, with which many factors affecting this system can be formulated so as to guarantee the objectivity and accuracy. The theoretical method is a development of evaluation system for the FGD projects.
Keywords/Search Tags:FGD, post project evaluation, AHP, multi-objective semi-structural, fuzzy comprehensive evaluating model
PDF Full Text Request
Related items