Based on the analysis of our nation's current situation of power market, this paper studies the necessity and feasibility of power contract market construction, then it proposes the principles and objectives model of the market, including near-term goal and long-term goal. Then it designs the route to near-term goal from the three dimensional of construction phase stage, space dimension and time level. On this basis, the paper designs the frame of operation mechanism, including transaction mechanism, price mechanism, coordination mechanism and risk prevention mechanism. The transaction mechanism is made up by organizational forms, mode of exchange, balance of quantity and electricity charges. Price mechanism studies the power price formation of negotiation, order matching, flotation and auction. Coordination mechanism is designed from the points of multi-level interaction and deviation of contract. Risk prevent mechanism includes the precautions of price risk, quantity risk and credit risk. It aims to provide reference to the construction of our nation's power contract market. |