The Control And Analysis Of The Progress And Quality Of "the Ninth Period Of The Project Expansion Of Guangdong Mobile GSM Networks"

Posted on:2011-06-14Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2189360305456978Subject:Project management
Abstract/Summary:PDF Full Text Request
The two goals, project progress and quality is relatively independent, and interrelated, quality is the life of project depends on whether the project progress, can finish. Construction unit (project implementation unit) of project management on project progress and quality of the management, only hold good project progress management to ensure project schedule of completion, acceptance and final accounts, at the same time, pays special attention to the project quality management is to ensure project quality, ensure project its benefits condition, only in both under the function of normal operation, the system can.If not found in the progress and quality of the connection point two goals, cannot according to advance towards the final goal of development, because of the work and the uncertainty of the implementation process of the interference factors, project implementation progress will deviate from the expected. Therefore in the project management of the original plan or managers must find the target formation, research and analysis of deviation rectification measures implementation countermeasure, deviations. Make two to one direction, can ensure finish in time expected project. Otherwise might happen not to finish the task or lower quality, even for the whole project may cause caused economic losses, postponed, and the quality of substandard acceptance, accounts, etc.Currently,"The Ninth Period of the Project Expansion of Guangdong Mobile GSM Networks"has already successfully completed, and put into production, the full acceptance and obtain benefits, the engineering design part of each index all reached the state department, Ministry of industry and information technology (Ministry of information industry), mobile communication standard issued by Guangdong Mobile and the relevant construction design standards. During the project implementation process, Progresses smoothly, schedule and quality can be guaranteed, The construction unit to achieve the project progress and quality requirements, and won the praise of construction unit. This is mainly attributed to our organization and solutions to play a leading role standards in our project cooperation unit, schedule and quality to take effective measures to control the cross. This paper through " The Ninth Period of the Project Expansion of Guangdong Mobile GSM Networks" in the process of implementing the progress and quality control, analyzes the factors in the whole project to find the optimal balance between the effective control measures and the progress and quality of the project can have a powerful guarantee. In a program concluded in construction, progress and quality are complementary, who also cannot heavy, light, Only a balanced development between symbiotic can,Progress and quality control in the project is very close relationship, complementary, only seriously complete progress control and quality control, can guarantee the task within a reasonable time to finish the project, and further ensure excellent progress and quality of the whole project, project construction.This project hope by two goals to research after the progress and quality of the project in similar control has guidance and reference, can be orderly, to a certain extent as accelerating construction progress, improving engineering quality guarantee.
Keywords/Search Tags:Project, Quality, Progress
PDF Full Text Request
Related items