Font Size: a A A

Study On The Key Elements Control Of National Forestry Cost Management Platform Project

Posted on:2011-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:T J HeFull Text:PDF
GTID:2189360305956978Subject:Project management
Abstract/Summary:PDF Full Text Request
Forestry Information and e-government construction has been to include the topic "forestry development" Eleventh Five-Year "and the long-term planning", the National Forestry Information Standardization Committee is to build the full-scale Forestry Information and accelerate the building of e-government will play an important role.National Forestry project cost management platform construction of the project subject to service in the forestry "Eleventh Five-Year" development of the overall situation, in accordance with national development strategy of informatization construction and the overall deployment, fully implement the State Forestry Administration of the Party Group on Comprehensive Promotion of the construction of modern forestry in general requirements. National Forestry project cost management project construction will effectively improve the administrative efficiency and public service capabilities, in line with national and Beijing e-government policy, so the construction of this project is feasible in terms of policy.At present the rapid development of foreign project management theory, but also more mature in the country, although the emerging theory, but in all kinds of enterprises has also been used more and more, project management theory, the essence of being a vigorous vitality show and the world. This article hopes in the national forestry project cost management platform project, the quality, time, cost, method of use, the results of the tracking and continuous improvement measures, summed up a set of project management methods used in this project, the project management theory and methods make use of other e-government information technology projects, to play a greater role.National Forestry Project Cost Management Platform project planning applied research aimed at the implementation of the present study to determine the scope of the project, and project time, quality, cost control, and expected results of scientific research and planning system in order to form a project management and pre-scientific control.First, we must determine the national forestry project cost management, the status quo and existing problems. The level of national forestry project cost, directly reflects the investment returns of the good and bad forest products, forestry, construction project fully reflects the quality of the work and management level. As the project is within a certain range belong to a larger amount of investment, strategic impact of a larger project, and that the project contain more affected by external factors, it must be delivered on schedule, so the project team not only need to manage the project itself, but also the need have a strong project-driven intensity; Therefore, in national forestry construction projects, only the national forestry project cost management as a core work, can we truly reduce the national forestry project cost, improve economic efficiency, described the development of national forestry project cost management platform necessity and feasibility. And to make recommendations for national forestry project cost management platform projects and construction of the basic principles of thinking, to play a guiding role in the implementation of the project.Second, we must properly handle the project management, quality, time, cost, the balance of the relationship. Elements of the project construction, these three are a mutual restraint, mutual influence of the continuum. Must seriously consider and properly handle three relationships, the cost of construction projects can be achieved provinces, time is short, the ultimate goal of high quality.Third, do a good job of national forestry project cost management platform, the project cost control. Cost control of the project's needs should first be the scope of control of control and the use of work breakdown structure (WBS) method of decomposition of the project needs. As well as the structure will be followed by decomposition of the demand function is decomposed into the smallest points, with the number of function points and some algorithms to estimate the national forestry project cost management platform implementation of the project costs and thus to control the cost of the project. Fourth, the project time control is also particularly important. In accordance with customer requirements whether the project can be delivered within the time is directly related to the project's economic benefits. Papers from the previous software project implementation process and lessons learned out of the factors that affect the project time control and developed a schedule control process and related methods to the progress of the project reasonable control.Fifth, do a good job of national forestry project cost management platform for the project quality control. In project implementation, we should firmly establish the "quality first" thinking, so that the "good re-seek faster, better and re-seeking province." In the National Forestry project cost management platform project, the company's leadership requirement will be in strict accordance with ISO9001 standards implementation. Quality control system from the project establishment and implementation and quality control tracking and improvement of the two major aspects of a detailed description of the national forestry project cost management platform project, the establishment of quality control system, implementation process and quality control tracking and improvement process. To enhance implementation of the project quality control efforts, the project in the company when implementing the quality system, equipped with a dedicated quality engineers to join the project team, quality engineers, the duties of supervision and inspection of project implementation, including progress, should be referred to the documents, project quality and so on, and to report regularly on the project superior departments in charge of project quality. Project Quality Engineer positions set up, which is equivalent in the enterprise to establish an internal supervision system, and the owner's side with the supervision, and better control of the whole process of project implementation to ensure the project is on schedule, within budget the costs, safety and high quality completion of project elements.To sum up, in order to project cost management platform for national forestry projects as an entry point to analyze the quality of project management, time and the relative balance between the cost to expand in this project is how to control the quality, time and cost. The successful implementation of project management experience for the future in this field in the implementation of the project management provides a theoretical guidance. At the same time, summed up a more effective project management models and methods and hope that, through the study of the project to identify a set of general software system for effective and efficient control methods. Also put forward their own inadequacies, and can be used to view the improvements made to explore future research directions.In short, the introduction of advanced project management concepts and methods in the national forestry project cost management platform for the successful implementation of the project played a more effective role.
Keywords/Search Tags:Project management, quality and time, cost of forestry, costs
PDF Full Text Request
Related items