Based On Knowledge Management Of Highway's Tender Pre-control Mode Of Research And Application

Posted on:2011-08-25Degree:MasterType:Thesis
Country:ChinaCandidate:G ChenFull Text:PDF
GTID:2189360308968682Subject:Project management
Abstract/Summary:PDF Full Text Request
Highway project and many other projects have the same nature, have the building of a one-time, geographic fixed, obviously life-cycle characteristics, while highway construction also has a specific scope of work and an extension of its construction and long face. In highway construction bidding phase of the front-end life cycle, its duration is not long but decided the latter part of the project construction and maintenance of all aspects of the implementation effectiveness and implementation of management. Unique and one-time as the construction of the most prominent features appear and knowledge transfer, sharing, reuse and recycling and so inconsistent. Knowledge management systems require owners to maximize the collection and highway construction bidding laws and regulations, technical standards and staff experience, these data tend to reflect the broader historical experience of the tender for the management of the owners provide a decisive basis for prevention and control measures. Knowledge management into highway projects, especially highway construction bidding phase is of great research value. This paper has done the following research:First, introduces the basic principles of knowledge management and the basic procedures for bidding highway projects, as a theoretical introduction to the article on knowledge management and management of highway construction bidding were discussed with each other that the tendering process the application of knowledge management is very necessary, but also suggested the use of existing. For the tender to build knowledge of pre-control system also made to think and reflect the research value.Second, then goes on to knowledge management theory, with highway construction bidding in the event of knowledge for knowledge pre-control systems approach to building. Specific knowledge of the tender pre-control system, the initiation, planning, implementation, evaluation of the various phases of the detailed analysis of the introduction.Third, then use the scientific method of explicit knowledge of knowledge on the highway works to tender pre-control. The use of CBR knowledge base management technology to build knowledge and analysis of tenders, through the bidding game theory to prevent the emergence of the use of economic means to pre-control bidding and contract issues, as a case applications of the theoretical supportFinally, Guang Xi Longlin (Guizhou-Guangxi border) to Baise Expressway as a case to introduce the knowledge of pre-control model of bidding in the tender phase of the application, the use of the knowledge base of experience in construction projects has been to analyze bidding this project the various problems that may arise and the application of game theory to prevent the bidding behavior of bidders, and the tender documents and contracts the terms of the use of pre-control limits for the unexpected events during the construction phase may well prepared. This case can serve as knowledge management in highway construction in the application of reference.
Keywords/Search Tags:Road Project, Bidding, Knowledge Management, Pre-control Model
PDF Full Text Request
Related items