Sort Optimized. Construction Schedule Construction Concept Analysis And Construction Organization Design,

Posted on:2002-09-26Degree:MasterType:Thesis
Country:ChinaCandidate:J C JinFull Text:PDF
GTID:2192360092980859Subject:Project management
Abstract/Summary:PDF Full Text Request
As the development of our country's economy and the consummating of market-economy system gradually. Many construction corporations are facing the much opportunity, but at same time, they are facing much difficulty, such as profit-ratio dropping, higher technique. So it becomes more important how to construct more reasonably to subdue the cost.After looking up much material ,the author of the article has done much work, such as generalizing the system of net-plan ,the effect and principle of flow-construction and illuminating the means of making the construction-plan more preferential .The author also has done much work in researching the superiority way of construction-sequence deeply ,and based on years' experience in construction management ,he start with fundamental concepts and raise the concept analysis way superiority-means to line up the steps and achieve it on computer in C .Finally he adduce two project examples to verify it and explain its effect. They manifest that the means dose not only shorten the period, but also decrease the cost of construction. I argue that the superiority-means about construction practically accommodate the most of construction enterprise .
Keywords/Search Tags:Construction process plan, Flow construction, Net plan technique, Construction unit superiority, Concept analysis way
PDF Full Text Request
Related items