Font Size: a A A

Zm Software Enterprise Project Management Practice

Posted on:2009-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:S L TangFull Text:PDF
GTID:2199360245478819Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Some critical problems, such as time management are discussed in medium or diminutive software enterprise.In the first place, the basic principle of project, project management, software and project management in software enterprise are it introduced. A case of project management is introduced in its author's enterprise. Two kinds of critical factors are analyzed detailedly in the project of high speed communicating equipment. That is requirement management and enterprise organization management.Software requirement analysis and its alteration must influence the project's whole schedule distinctly. So requirement analysis' definition, task, pricipline and method are introduced. Then the cause and price and management of requirement analysis and alteration are analyzed.All human's influence is assumed into organization management. It introduces the influence of management team and project team and member inside.And it discusses the prolem of communication in the project team.Time management's implement are described in software project in detail. We have to get work breakout structures, arrange different jobs, evaluate work time, and work out project's schedule. It analyzes some special factors in software time management such as programmer's influency, circulative and iterative character in software progress. Then it introduces how to control the schedule including planning, implementing, controlling and reporting.Finally it introduces the conclusion and the problem which it can not be solved in the paper.
Keywords/Search Tags:project management, time management, requirement control, requirement analyse, organization management
PDF Full Text Request
Related items