Value Engineering Is Settled River Hydropower Project

Posted on:2009-11-09Degree:MasterType:Thesis
Country:ChinaCandidate:L YangFull Text:PDF
GTID:2199360248952706Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Building a hydroelectric project is normally limited by natural condition, difficult construction, long construction period as well as tremendous investment. With the diversification of investment in the hydroelectric market, driven by their economic interests, the project owners and hydroelectric power investors are currently showing their strong willingness to have the engineering project produced results as earlier as possible through effectively control on the project investment, so as to guarantee the construction quality, lower the risk and speed up the progress of the project. Value engineering, as a scientific method combined with technology and economy, is undoubtedly an effective means which can meet the above demands of the project owners.In consideration of the requirement from the project construction owner, value engineering is a scientific research method which takes the value increment as its goal and its research importance is to optimize scheme in the design phase through completely researching and analyzing the relation between function and cost. Through utilization of value engineering theory in the hydropower station, comparatively researching the preliminary design plan among multiple schemes and reseasonably optimizing the construction process will effectively lower the lifetime operational cost for the project and increase the complex benefits of the project. This paper has practically presented the application and research of value engineering on the project of Luojiaohe Hydropower Station. The goal of value engineering had been made by analyzing the demand of the owner of Luojiaohe Hydropower Station and the research object was defined by using the ABC analysis method. The research method of value engineering was adapted to analyzing It realized the functional goal of the project with low cost and high efficiency within relatively short construction period. The whole engineering project was completed one year ahead of schedule and the power was generated half year before the schedule, it has showed that the application of value engineering has achieved great economical and social results on the project of Luojiaohe Hydropower Station at Defang County, both the local county government and station owner are very satisfied with the benefits from earlier completion of the project.Combined with the theory and practices, this paper finally brings forth the problems to be solved for value engineering in the construction of a project and the future research direction of this subject.
Keywords/Search Tags:value engineering, construction project, Luojiaohe Hydropower Station, optimization application research
PDF Full Text Request
Related items