Investment control in engineering construction project is playing a prominent role in national economic construction. But at present it is a widespread phenomenon that investments lose control in practice in many big and medium construct project. The problem constrains and affects seriously investment performance of big and medium construction project. Investment control of construction project not only can Prevent investment from breaking through the quota , but also can promote the limited manpower,resource and financial resources of development enterprise, designing institute and construction enterprise to get fully use and gain the best economic performance and society beneficial result。The paper takes a study on a special investment management in engineering project of a Power plant units Extension objects. This Paper introduces the basic content of construction cost management and the investment controls of such five respects as investment decision stage,design stage,tender and invite tender stage,construction stage and completion settle accounts stage which affected the Project investment, and Put forward to strengthen each investment control link of the whole course and meaning, then, this paper analyzes the problems of every investment control stage. This Paper a(?)ording to the analysis of the problems which exist in each investment control link, discussed the countermeasure and suggestion to do the investment control work, summing up a series of workable,practical,strong control measures, expect it can have a guidance effect on the real project。... |