Font Size: a A A

Railway Construction Project Management Performance Evaluation System

Posted on:2009-08-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y J WangFull Text:PDF
GTID:2199360278469610Subject:Civil engineering planning and management
Abstract/Summary:PDF Full Text Request
Nowadays, with the expansion of enterprises, the performance evaluation of railway construction project management becomes ever increasingly more important that not only monitors the implementation of the enterprise's strategy and plan as the core of the management control system, but also becomes the effective tool for the enterprise strategic communication and convey. Beginning with the fundamental theory research of the performance evaluation of railway construction project management, this paper analyses the background and significance of the performance evaluation of railway construction project management, and summarizes the international models of the performance evaluation of railway construction project management. It comes to a conclusion that it is indispensable to analyze the current situation of the performance evaluation of railway construction project management in our country. Through the current investigation and research, it analyzes the existing problems of the performance evaluation of railway construction project management in our country, and carries on the analysis of origin cause of formation, tending to put forward a set of technology schemes suitable for the performance evaluation of railway construction project management in our country.The evaluation of railway construction project is based on establishing a practical and reliable index system for the performance evaluation of railway construction project management. This paper studies the current situation and influencing factors of the index system for the performance evaluation of railway construction project management, laying a theoretical foundation for establishing the index system for the performance evaluation of railway construction project management. And taking the "Balanced Scorecard" theory as the basic framework, it integrates the interest requirements of different stakeholders, and acquires the Key Success Factor and Key Performance Index for railway construction enterprises. On this basis, it mainly arranges the specific schemes for implementation and the detailed regulations for evaluation of the performance evaluation of railway construction project management, and forms a whole set of operable detailed regulations for implementation of the performance evaluation of railway construction project. By verifying the practical evaluation process, it assures the practicability and effectivity of this index system. Combined with the idea of whole-life cycle management for engineering project, the internal process of the performance evaluation of railway construction project management has been established.From the analysis above of the existing problems of the performance evaluation of railway construction project management, the cause of the problems and the index for the performance evaluation of railway construction project management, the paper puts forward the supporting measures accelerating the performance evaluation of railway construction project management.
Keywords/Search Tags:Performance evaluation, Railway construction, Engineering project, Balanced Scorecard, Information System
PDF Full Text Request
Related items