Font Size: a A A

Tank Heat Storage Transformation Project Progress And Quality Management

Posted on:2011-06-20Degree:MasterType:Thesis
Country:ChinaCandidate:Y ChangFull Text:PDF
GTID:2199360302998761Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
A policy concerning energy-saving, emission-reduction and building of the saving society has been made by the government in recent years. Therefore, most projects of the petrochemical industry are energy-saving ones. And petrochemical characteristics determine the duration of the progress of their projects. Many hidden projects are in good condition, which provides good prerequisites for petrochemical installations'long-period operation. Being on the basis of solving practical problems, studies of the progress and quality of such projects will help to establish a construction system so as to ensure the fulfillment of their progress and quality.According to the general requirements of the projects, pre-construction schedule about the duration of the project can be made by applying project management knowledge. To develop programs of the manipulation of the progress, factors that affect their plans should be identified. While the construction began, according to projects'characteristics, the key processes can be figured out. And the project network plan can be made by using network planning techniques. Meanwhile, in order to achieve continuous optimization of the schedule, the actual duration and crucial path should be calculated. Finally, a satisfying network plan is formed.Because the hidden project accounts for a larger proportion of the entire project, it is necessary to take the long-term running of the equipment into consideration once the construction is completed. Through the research of the project quality, the overall quality objectives and quality plan should be put forward at first, which constitutes a quality security system of the construction units. The duties and powers should be decomposed. Finally the construction quality should be strictly controlled by identifying their key points, so as to achieve the overall project quality standards.Of course, through formulation of the project progress and analysis of their quality, an effective way, which aims at the flammability and explosion of petrochemical industry, can be found to control the progress and quality. It will be a good reference to the transformation and maintenance of the project in the future.
Keywords/Search Tags:transformation of thermal energy storage tank, control and schedule of progress, plan and control of quality
PDF Full Text Request
Related items