Analysis On Schedule Plan And Control For Machinery Manufacturing High-strength Steel Production Line Of Shougang

Posted on:2009-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:W MaoFull Text:PDF
GTID:2189360308479485Subject:Project management
Abstract/Summary:PDF Full Text Request
The effect of construction project investment depends directly on whether Construction project can be handed over on time or not. One of the fundamental task of construction project management is effective control and plan of construction progress which can direct to our setting target. Construction project is the most numerous and typical one. The theory of project management provides the theoretic basis for construction project management and ensures it become more and more systematic and scientific.Based on related management knowledge, taking the machinery manufacturing high-strength steel production line of Shougang building as object, the thesis expatiates the application of theory, process and means of project plan and control in construction practice. The text begins with introduce of prophase of production line building construction include progress plan and control, the production line does not use the fashion of general contract, but every engineering has its contractor. By the means of building effective project framework and cooperation, defining the duty and main contents of coordination and management, then do the object coordination and management work best, supply the protection of organizing and means from management. Then, the text illustrates establishing process of the progress plan and concrete content of progress control. By the means of investigating and determining the target of network plan, definiting the precedence relationship of working. Using the tool of critical path and computing endurance work's time, profiting the schedule plan of machinery manufacturing high-strength steel production line of Shougang. By the same time, analyze the influencing factors of object's schedule plan. During the object processing, collect the information of object actual schedule, hand the advance of object, treat the collecting data of real schedule, format comparable data for object schedule plan. As the target of holding object phase and guaranteeing quality of object and minimum cost, adopting the against way and adjusting the schedule based on the result of comparing real schedule and planning schedule. Offer the solving of influencing factors by dynamic monitor and schedule control. Finally, it analyses the problems in the project progress and provides the corresponding solving measure.
Keywords/Search Tags:Project Management, Schedule Plan, Schedule Control, Schedule Adjusting, Coordination Management
PDF Full Text Request
Related items