Font Size: a A A

Optimize The Model Of Project Management

Posted on:2002-12-31Degree:MasterType:Thesis
Country:ChinaCandidate:C H GuFull Text:PDF
GTID:2206360032451683Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
It is our~task solved about how to optimize the model of projectmanagement,which can let our engineering technology into the international marketmore better,and fasten engineering consultant internationalize,and enhance the level of projectmanagement of engineering consultant,and consolidate national market at present.Some project contracting system which prevailing in the international construction aredeeply studied on its organization structure its organization structure,the structure of coalition member,the tenure ofparticipants,assignment of responsibilities(separted and cooperative contracting methods,integrated contracting methods,~ management oriented contracting methods,the methods of PFIand ABS) in this paper.While,the relationship of engineering supervisor and project managementof client is analyzed in china.The function and the service range of the international engineeringconsultant are compared with the engineering supervisor of china in the model of projectmanagement.This thesis argued that tenure of design party is inadequate and the supervisor'sservice range is too limited in the constructing.At the end, this thesis analyzed the subjective andobjective cause of the present~status of the engineering supervisor in china.This paper provides an optimized model in project management,separated the engineeringconsultant into two layers,those in of the project planning and controls as upper and thoseonly do the supervise in the constructing as the second layer,through the comparative analysismethods and accounting for the status of china. Therefore it can strengthen the tenure of thedesign party and widen the service range of engineering consultant,which can let the projectmanagement model approached to the international routine.The initial studies considered in thispaper is benefit to wholly exerting the present engineering technology strength,,then theeffciency of the project organization can be improced and project can complete better,it also can-- the -- ablity Of the -- consultantS and bo the innoedon ofthe Me coedtw ~ In arelusbo bo are ~y vale OfeCOmp if the ~Ml of wiect wi aopy to edw pebo and pe point in mplOytng thesoPtnd ndl.
Keywords/Search Tags:Engineer, Project, Management, Optimization
PDF Full Text Request
Related items