Font Size: a A A

Electric Multi Enterprise Endogenous Capacity

Posted on:2006-08-05Degree:MasterType:Thesis
Country:ChinaCandidate:Z K TanFull Text:PDF
GTID:2209360182468729Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
In a competitive and open market , viability is the basic condition that an enterprise can lie with . And it is also the important condition that corn ability can be constructed . However because of the national political burden and trade system obstacle in long-run plan economy, the power enterprises' viability in our country have become very weak. This situation has prevented the power enterprises' development in market economy. Thus government should get rid of those factors first. Or the enterprises will be defeated in unequal market competitive environment. This paper has studied the viability of the power enterprises in the method that theory combines with real example. In theory, this paper first analyzes the difficult situation of the power enterprises in power system reform circumstances, and draw the subject of viability construction based on this. Then the paper discusses the reason why the power enterprises luck viability so wide. Finally, the paper gives some suggestion about the development of viability.This text has taken the method that theory combine with real example, regard Chao neng power company as a case build viability. As a general manager of Chao neng, the writer gives a system solution to solve the viability problem of Chao neng including a new strategy plan, innovation of old administration system. The case has an important meaning for the reformation of stated owner enterprises...
Keywords/Search Tags:power trade, varied enterprises, viability, Development Strategy
PDF Full Text Request
Related items