Font Size: a A A

Ppp Model In The Quasi-operating Public Infrastructure Projects In Yunnan Province

Posted on:2007-10-15Degree:MasterType:Thesis
Country:ChinaCandidate:L T ZhuFull Text:PDF
GTID:2209360212986828Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
The importance of public infrastructure has been acknowledged by the whole world. Public infrastructure projects is a long construction period, the huge investment of public welfare projects, the government has played an indispensable role. But with the development and progress of society, rely on the state is far from being able to meet the huge demand for investment, building public infrastructure in the high input, high consumption of resources and low efficiency, has become a worldwide problem.Owing to rapid economic development, the existing infrastructure has been far from adequate to meet the demands of national economic development. Speeding up infrastructure construction, reform of the existing investment and financing, and improving the efficiency of the current investment in public infrastructure construction problems that need urgent solution. PPP mode is adopted by the government and the private sector to cooperate in developing infrastructure to achieve the interests of all parties involved, shared responsibilities and risks. Its characteristics are more using the power of the private sector and less reliance on government departments to meet the needs of the public. PPP model is applied to public infrastructure on the latest model, through public-private cooperation in the form of more and more private sector investment in, construction, management or ownership of public infrastructure. From the organizational and institutional characteristics of the PPP mode, it is more applicable to the policy of each quasi-profit public infrastructure projects.Based on the study of literature at home and abroad, based on analysis of the historical background and basic theories of PPP and the PPP mode focused on the financing of projects. Case studies in the combined analysis of the PPP model in the mode of operation of public infrastructure projects, project stakeholders and their responsibilities and operation procedure, and so on. Yunnan article on the development and public infrastructure investment and financing based on the analysis of the statusquo in light of the development of the private economy and private capital to explore potential business in Yunnan Province in building quasi-profit Public public infrastructure necessity and feasibility of the introduction of the PPP model. Finally,Yunnan allowed to operate quasi-profit public infrastructure construction and application of the PPP mode proposed countermeasures.
Keywords/Search Tags:PPP Mode, Quasi-profit Public Infrastructure, Yunnan
PDF Full Text Request
Related items