Management On Investment Control Of Yiyang Railway Construction Project In Shouguang Province

Posted on:2012-04-11Degree:MasterType:Thesis
Country:ChinaCandidate:C C LiuFull Text:PDF
GTID:2212330338464598Subject:Project management
Abstract/Summary:PDF Full Text Request
This article combines with the practical situation of railway construction and accords to the investmen control and product life cycle management principles in the whole process of railway construction . Yiyang-railway construction project will be divided into investment decision-making stage, designation stage, bidding stage, implementation and completion stage. Based on the actual situation of project management, investment controls of each stage are studied in detail.Firstly, this paper describes the background and status in domestic and foreign research,the ideas and methods in research; Secondiy, along the Yiyang-railway construction program,it analyzes the problems that have happened in investment decision-making stage, designation stage, bidding stage, implementation and completion stage;Finally, it proposes the countermeasures to improve the investment control in the various stages.Decision-making stage passes through the implementation of the project legal person responsibility system ,a clear investment control of the main, and determines the building goal of a scientific and rational, then strengthenes the control of the main building indicators and the economic evaluation of the project to control the investment. Designation stage must strictly carry out the designing bidding, and use engineering designation bidding and designation proposal campaign.A rigorous examination will control budget in the estimation.Actively using a limiting designation can strengthen the designing consultation to achieve the optimization of the control objectives. The bidding stage must strictly enforce the bidding responsibility.Through standarding bidding behavior determines a reasonable contract price. The construction stage should strengthen local coordination and contract management and claims management.It strictiy controls the changes of designation,A sound reward and punishment supervision system is established.Completion stage shoud audit the completion settlement strictly and carry out comprehensive evaluation of the work of construction projects.The above methods lead Yingyang-railway construction project investment to more effective control, and achieve the maximum effectiveness of the project.The innovation of this paper is mainly manifested in two aspects: Firstly, investment control of the project management theory and methods are applied to the railway construction investment control and management, so the railway construction investment control analysis and evaluation model are established.These do the basic work for further studies ; Secondly this paper uses qualitative and quantitative analysis, dynamic analysis and static analysis method of combining. The subject of study uses a new project management concept as a guide, and it researches practically in the form of vivid examples of railway construction project with a rich theory experienc combination...
Keywords/Search Tags:Railway construction project, Management on investment of project, Investment control, Investment control measure
PDF Full Text Request
Related items