Font Size: a A A

The Improved Design Of Train Inspection Hand-Held Compouter System

Posted on:2012-09-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y WeiFull Text:PDF
GTID:2212330338467061Subject:Vehicle Engineering
Abstract/Summary:PDF Full Text Request
To speed up the construction of vehicles using security and warning systems, changing the current construction of vehicles using management practices and gradually reduce on-site staff must strengthen the operation vehicle dynamic monitoring, and stand by adjusting column is prohibited by layout, optimizing repairing the practices by reorganization of listed, improve van overhaul method, the realization vehicle safety guarantee from tradition to modern times, by people from the extensive equipped and to control the cross to intensive, fully realize people check and machine retrieve division of labor, the union, effectively improve the efficiency of the listed inspection, thus effectively improve overhaul transportation vehicles through the ability.With the development of equipment on the railway, management style and management level of equipment have been proposed higher requirement. The traditional manual management already can not adapt to the real manager. Now by a 5T system information feedback, manual copying intercom forecast the transfer mode, in the train arrive operational periods dense, can't take this vehicle is the vehicles the accurate and timely send site each inspection car member, is caused extremely easily leak leakage repair, safety is difficult to be effectively guarantee, meanwhile on-site inspection car member cannot put the current car homework found fault and problem identification information timely feedback to workers on duty room and dynamic inspection car members, information, the closed-loop unable to realize the accuracy, completeness, timeliness, to ensure production operation organization of column detection caused more tremendous influence.So we must use advanced means of information to meet the demand of Modern railway freight management real-time, sex and automation, such as the application of computer technology, communication technology and intelligent equipment. The development of informatization railway freight prompted by the train inspection hand-held computer system have listed. The purpose of the train inspection hand-held computer system is used to provide comprehensive use of railway freight information service. Through this system, using HMIS,5T and network buckle train system that find timely and accurate information to transmit the hand of worker at the first issued, and feedback the spot appraisal process information, the trouble train information finding and disposing by artificial inspection, the job performance information and other relevant information, through intelligent equipment and wireless network communication equipment, realize records and sharing, and bring about Fast and accurate data transmission and the comprehensive analysis of the test data, that provide decision support for safety production, and strengthen the guidance of the work of production safety.
Keywords/Search Tags:the train inspection hand-held computer, 5T, HMIS
PDF Full Text Request
Related items