Font Size: a A A

Analysis On Cooperative Game Of Construction Facilities Based On PPP Mode

Posted on:2012-01-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y LengFull Text:PDF
GTID:2217330368475919Subject:Quantitative Economics
Abstract/Summary:PDF Full Text Request
As China's economic prosperity, people's living standards improving, sports industry as a important part of spiritual and cultural needs of the people, is rapidly developing. In recent years, we bid and hold a number of large events such as 2008 Beijing Olympic Games and the just-concluded Asian Games in Guangzhou. However, because of a series of characteristics of the stadium it is higher operational risk, high amount of investment, construction is difficult, slow return of income, whether government or private enterprises operating unilaterally, have great difficulties. In this article I mainly take the mathematical analysis and other methods to analyze supply of sports facilities in the construction, operation and financing of the current situation, problems and the supply of sports facilities as a public and moral theory.(1) By construction and operation of public sports venues market, to join the private sector, it can effectively solve the problem of government funding, reducing government pressure, increasing the supply of sports facilities. Government departments can help private enterprises with solving problems, which constructing operation of the decision-making on incomplete information and related policies. Reducing the risk of private sector participation in construction and operation of sports facilities. It can be a good solution to sports venue construction and operation of all these problems.(2) Sports facilities as a quasi-public goods supply should ensure that the public welfare. This is the problem which stadium after market construction must pay attention to. In addition, some public demand for sports facilities is local or regional. Effective supply of public goods is the key to consumers by their consumption of public goods received from the utility said the real demand for their products to the public, and, accordingly, bear the cost of public goods. Therefore, we must to know a more accurate supply in order to solve the problem of effective supply of public goods, we must design a mechanism able to accurately reveal people's preferences.The study is divided into five parts:The first part by previous studies, analysis of the nature of the supply of sports facilities, current situation and problems. The second part is to study abroad this year to supply the more popular mode of public-private partnership, the PPP mode of sports facilities in the supply side of the advantages of PPP mode and stadium construction and operation of various aspects of the operation were analyzed. Come under the PPP model construction and operation of sports venues are public-private partnerships in financing, organization, construction, management, operations, and in come distribution and a series of activities, conclusions. Inherent flexibility of the management organization structure, analyze its nature between government departments and the private sector for construction and operation of various components of a complex series of contract design. The third part is to establish PPP mode stadium construction and operation of the cooperative game framework. This part of the PPP theory based on rational agent model stadium construction contract to design analysis, starting from the principle of maximizing benefits to consider in the contract setting the behavior of all participants, through the cooperative game theory to describe the mechanism of contract design, drawn in PPP mode, the supply of sports venues during the operation, to protect the public welfare of sports facilities, the primary purpose of ensuring the stability of cooperation is to handle the distribution of benefits and risks. The fourth part, the establishment of cooperative game model, considering the project participants, the contribution of the project, input costs, bargaining power, risk preferences and other factors, the use of shapely value method and the rights and risks based on the comprehensive evaluation method, on the PPP project contract The core part of the development - income distribution and risk sharing mechanism, a new calculation scheme. The fifth part is described by specific cases.
Keywords/Search Tags:PPP mode, sports facilities construction, cooperative game, income distribution, risk-sharing
PDF Full Text Request
Related items